Evolved Robotics Engineering

SAN DIEGO STATE UNIVERSITY

subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Home

robot

Welcome to Evolved Robotics Engineering(ERE). Our company's mission is to introduce a new generation of evolved robots to the robotics enthusiasts. Our break through product is the Mini Sumo Robot, "Yokozuma." It has the ability to detect its opponents and after detection it attacks the opponent, attempting to push it out of the ring. The details of the robot can be read under the project link.

 

 

Progress and Current Stage
The Programming of the Robot is 95% done, we are still in the debugging phase, the sensor testing is completed, the PCB is done, two mini server motors are being used for the robot, the wheels are ready, and the fabrication of the frame has been completed.

Analog: The Analog team is working on final robot testing and last minute adjustments.

Digital: The digital team is debugging the code and is working on the finla adjustments to the mini sumo robot.

 

 

©2007 Evolved Robotics Engineeringvolved Robotics Engineering